Engineering Team Readies for Amananth Mission

UUNN Newswire

(UUNN HQ)  The engineering team that will go to Amananth to try to help diagnose and repair the problems with the Antiflux Custom Producer has been named, and will launch from Solrain Wake Station on 117.2.22 at 21:30 UTC.

The team includes eight members from Aristio Conglomerated  (1), Lexxor Intelligence (2), Solrain Engineering & Technology Group/SET (1), TRI Corporation (2) and T&P Systems (2).  Only one member of the team is jump-capable, so he will be piloting the ship and the rest of the team will make the trip in cryo-stasis.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s